Baku-Tbilisi-Ceyhan Main Export Pipeline

1,768 km Total Length
1.2 M Barrels/Day Capacity
42" -46" Diameter
4.7 B Barrels Transported

Pipeline Sections

Azerbaijan Section

Length: 443 km

Diameter: 42 inches

Key Facilities: Sangachal Terminal, 7 pump stations

Districts: Garadagh, Absheron, Hajigabul, Agsu, Kurdamir, Ujar, Agdash, Yevlakh, Goranboy, Samukh, Shemkir, Tovuz, Agstafa

Georgia Section

Length: 249 km

Diameter: 46 inches

Key Facilities: 2 pump stations, block valve stations

Crosses through 7 districts with significant mountainous terrain

Turkey Section

Length: 1,076 km

Diameter: 42 inches (reduces to 34" at terminal)

Key Facilities: Ceyhan Marine Terminal

Crosses through 9 provinces to the Mediterranean coast

South Caucasus Pipeline (SCP)

The SCP runs parallel to BTC and transports natural gas from the Shah Deniz field. It is a crucial component of the Southern Gas Corridor, delivering Caspian gas to European markets.

692 km Length
20 BCM Annual Capacity